These are some of our featured
projects that demonstrate the broad variety of projects we have
undertaken. Click on the pictures to view a detailed summary
sheet for the project.
 |
Bellefonte Area School District Admin. Building |
| Ling Partnership was given the
responsibility to design and coordinate the replacement of a
steam boiler, after the existing boiler failed in place and
began leaking steam. |
 |
Bennett Family Center |
| Ling Partnership was
responsible for the design of the mechanical, electrical,
plumbing, and fire protection systems for Penn State’s
newest child care facility in collaboration with Kieran
Timberlake Architects. |
 |
Church
of the Good Shepherd |
| Ling Partnership was
responsible for the design of the mechanical, electrical,
plumbing, and fire protection systems for State College's
second Roman Catholic church. |
 |
Frear
North Laboratory |
| Ling Partnership provided a
study of the HVAC systems of North Frear Building. The study
was a first step in a process to improve the performance of
the existing mechanical systems. |
 |
Golden
Pond Girl Scout Camp |
| Ling Partnership provided
design services for HVAC, plumbing and electrical systems,
as well as assistance in acoustic analysis for the Hemlock
Girl Scout Council's newest camping facility. |
 |
Indoor
Track Facility |
| Ling Partnership was chosen to
design the mechanical, electrical, and plumbing systems for
its Intercollegiate Athletics Multi-Sport Facility in
collaboration with NBBJ Architects. |
 |
NASA
Robotics Engineering Consortium |
| The Architectural Engineering
firm of Burt Hill Kosar Rittelmann engaged Ling Partnership
to design the fire suppression system for the large
facility, which is used to develop and test robotic
equipment. |
 |
Neff
Elementary School |
| With this project, Ling
Partnership designed the first Geothermal System for a
school building in Pennsylvania. The system had a lower
construction cost and provided 15% savings in energy costs. |
 |
Old
Main |
| Ling Partnership was given the
responsibility to study and design the mechanical renovation
of Old Main to bring in outside ventilation air to all five
floors of this historic Penn State landmark. |
 |
Pine
Hall Lutheran Church |
| Ling Partnership engineered the
new mechanical and electrical systems to provide air
conditioning for the entire facility. Also, new lighting
fixtures were installed in the sanctuary to provide an
improved lighting level. |
 |
PSU
Backflow Preventer Study |
| Ling Partnership was
commissioned to study the backflow prevention
systems of the domestic water and fire protection water main
service entrances for more than 600 Penn State buildings
across Pennsylvania |
 |
PSU
Blue Band Building |
| Ling Partnership was pleased to
provide MEP design services for the new home of Penn State's
Blue Band. After years of living out of a trailer,
they finally have a permanent home that reflects their proud
reputation. |
 |
PSU
Telecom. Infrastructure Improvement |
| Ling Partnership provided
professional services for the design of the general
construction, mechanical, and electrical systems supporting
the telecommunications system expansion. |
 |
Rackley Building |
| Ling Partnership designed the
mechanical and plumbing systems for the renovation of the
third and fourth floors in collaboration with Hoffman &
Popovich Architects. |
 |
Shaner
Hotel Group Corporate Headquarters |
| Ling Partnership designed the
electrical systems for the Shaner Hotel Group’s new
corporate office. The design included power
distribution, interior and exterior lighting, telecom
infrastructure, and life safety systems. |
 |
Silver
Lake Commons |
| Ling Partnership designed the
mechanical, electrical, and plumbing systems for this
72-apartment senior care facility in conjunction with
Perkins Eastman Architects of Pittsburgh, PA. |
 |
Wartik
Laboratory - Room 108 |
| Ling Partnership designed the
mechanical and electrical systems required to convert the
existing lecture hall into a state-of-the-art video
teleconference room in collaboration with Kieran Timberlake
Architects. |
 |
Whitmore Laboratory |
| Ling Partnership was the prime
consultant for the architectural, mechanical, electrical,
and plumbing design of various renovation projects within
Whitmore Laboratory. |
 |
Woodcrest Villa Apartments |
| Ling Partnership provided
professional services for the design of the mechanical,
plumbing, fire protection, and electrical systems supporting
the retirement community. |